Recently Written Account 8.10.24
$4.1M Recycler purchased GL/Contractors Pollution Liability/Site Pollution Liability ($1M/$2M) and Excess ($5M/$5M) for $102,929. This account previously had its GL and CPL/Site Pollution coverages written with separate carriers, and the producer was looking to place them with a single carrier to reduce the potential for coverage gaps or duplications. In this process, it was discovered that there some unusual mismatches that needed to be addressed. We were able to manuscript three separate coverage endorsements to deliver what the insured needed.